Introducing the HKS RB26 Vcam System Step2 (w/Valcon RB) available at Terra Firma. This Variable Valve Timing System takes the classic RB26 engine to the next level, combining the "V CAM SYSTEM" with the "VALCON type RB26" as an affordable set.
The Step2 Vcam System features a specially designed cam with a duration of 264° and a valve lift of 8.7mm. Compared to the solid Step1 camshaft (272IN-272EX), Step2 offers smoother acceleration at high RPMs. This camshaft is ideal for achieving higher power outputs across the entire engine RPM range.
When used in conjunction with upgraded Valve Springs at high RPMs (recommended limit of 8500rpm), Step2 provides enhanced strength and durability. You can expect substantial improvements in engine output and torque compared to the solid Step1 (272IN/EX). Step2 is specifically designed to deliver significant power and torque gains, especially for vehicles tuned to output 600ps or higher, surpassing the performance of the old type Step1 type B (256EX).
With the "VALCON type RB26," you can enjoy a variance of 50°, unlocking even greater performance potential. However, please note that HKS Forged Pistons are required for optimal compatibility. Additionally, the Power Writer Communication Cable (42999-AK010) is necessary to maximize the capabilities of the Vcam System.
With a maximum RPM of 8,000rpm (subject to the stock rev limiter), the HKS RB26 Vcam System Step2 offers a powerful solution to transform your RB26 engine into a new generation powerhouse. Explore the performance advantages and unleash the true potential of your RB26 engine with the HKS RB26 Vcam System Step2 (w/Valcon RB). Visit Terra Firma today and take your RB26 to new heights.
- For new Step2 system without Valcon, Click Here
Required Parts
- Exhaust Camshaft STEP 2 - Recommended : STEP1 272°
- Valve Spring - STEP 2 - HKS Uprated Valve springs (for increasing maximum RPM, Sold separately)
- Piston - STEP 2, Pro - HKS Piston for valve⇔Piston Clearance
Questions & Answers
Ask a Question-
When will I be able to put in a order for one of these ?
Hi, You can order direct from the web site! We also have a few Step one uints that should be here on 10/7 or 10/9/2022. Thanks!